Utility Connection and Tap Fees

Water Connection Fee

3/4" Meter - $425.00      1" Meter - $475.00  

Each building will be classified as a seperate connection

Water Tap Fee Cost estimate to be provided; fee shall be equal to the total cost of installation, including materials, equipment and labor
Wastewater Connection Fee $100.00 - Each building will be classified as a separate connection.
Wastewater Tap Fee Cost estimate to be provided; fee shall be equal to the total cost of installation, including materials, equipment and labor
Electrical Connection Fee $500.00 (200-amp 2s)
Electric Tap fee Cost estimate to be provided; fee shall be equal to the total cost of installation, including materials, equipment and labor

 

 Request for Utility Services